Current Events

Current Events

Office Hours:   Monday - Friday 7:30 A.M. - 4:00 P.M.

Home   -   Departments   -   Current Events   -   Road Construction Updates  
 Road and Bridge Department Projects Photo Album   -   Links   -   Contact
- Drainage -

PREBLE COUNTY COVERED BRIDGES

 

FAMILY DAY PICTURES

 

 

CURRENT AND UPCOMING ROAD CLOSURES

 

HUESTON WOODS PARK info FLYER

ACCESS MANAGEMENT

ROAD CLOSINGS

***************************************************************************

* ATTENTION *

The Preble County Engineer’s office will be resurfacing Shields Road from Eaton Lewisburg Road to Lewisburg Western Road during our 2011 paving program.  Before the road can be resurfaced the Engineer’s Office will be replacing several drainage tiles under the road in that area. The road will be closed daily as weather permits, from 7 a.m. to 5 p.m. starting June 20th until all tiles have been replaced.  There will be open cuts across the road so we will not be able to except any traffic during the daily closures, so please plan an alternative route. Thank you for your help and cooperation.  If you have any questions please contact the Engineer’s office at the number below.

Jim Ray
Preble County Engineer's Office
Road Supervisor
1000 Preble Drive
Eaton, Ohio 45320
937-456-4600 (office)

Thank You!

 
******************************************************************
ROAD NAME: Sonora Road
BEGINNING AT: Rockridge Road
ENDING AT: 4082 Sonora Road
CLOSING DATE: October 31, 2011 at 7:30 a.m.
RE-OPENING DATE: Approximately 4 Weeks
CURRENT STATUS: OPEN - November 10, 2011
WORK DESCRIPTION: Full Bridge Replacement
LOCAL TRAFFIC PERMITTED: NO
EMERGENCY TRAFFIC PERMITTED: NO
SCHOOL BUSES PERMITTED: NO
 
ROAD NAME: West Florence Campbellstown Rd (Boxes 911-1111)
BEGINNING AT: St. Rt. 122
ENDING AT: Paddock Rd
CLOSING   DATE: October 10, 2011
RE-OPENING DATE: Approximately 5 weeks
CURRENT STATUS: OPEN - October 25, 2011
WORK DESCRIPTION: Full Bridge Replacement
LOCAL TRAFFIC PERMITTED: NO
EMERGENCY TRAFFIC PERMITTED: NO
SCHOOL BUSES PERMITTED: NO

 

ROAD NAME: Camden College Corner Road
BEGINNING AT: Buck Paxton Road
ENDING AT: Hedge Row Road
CLOSING   DATE: October 3, 2011 at 7:30 a.m.
RE-OPENING DATE: Until May 2012
CURRENT STATUS: CLOSED
WORK DESCRIPTION: Full Bridge Replacement
LOCAL TRAFFIC PERMITTED: NO
EMERGENCY TRAFFIC PERMITTED: NO
SCHOOL BUSES PERMITTED: NO

 

ROAD NAME: Ketterman Road (Mailbox #'s: 4035-4243)
Beginning At: St. Rt. 122
Ending At: Sharpsburg Road
CLOSING DATE: July 11, 2011 at 7:30 a.m.
CLOSURE TIMES: Late November 2011
CURRENT STATUS: OPEN - December 1, 2011
WORK DESCRIPTION: Bridge Replacement
LOCAL TRAFFIC PERMITTED: NO
EMERGENCY TRAFFIC PERMITTED: NO
SCHOOL BUSES PERMITTED: NO

 

ROAD NAME: Junction Road (Mailbox #'s: 6161-6300)
TOWNSHIP: Camden College Corner Road
LOCATION: Simpson Road
CLOSING   DATE: July 18, 2011 at 7:30 a.m.
RE-OPENING DATE: Late November 2011
CURRENT STATUS: OPEN - December 1, 2011
WORK DESCRIPTION: Bridge Replacement
LOCAL TRAFFIC PERMITTED: NO
EMERGENCY TRAFFIC PERMITTED: NO
SCHOOL BUSES PERMITTED: NO

 

PUBLIC NOTICES

A PERMIT IS REQUIRED PRIOR TO DOING ANY TYPE OF WORK IN ROAD RIGHT OF WAY ALONG ANY TOWNSHIP OR COUNTY ROAD.

A WRITTEN PERMIT IS REQUIRED FOR ANY OF THE FOLLOWING TYPES OF WORK:

1.     Any type of utility work including replacement of existing utility poles.

2.     Any driveway installations for new driveways or for replacement of driveway pipe under an existing driveway.  Minimum requirements for driveway pipes are:

A.  Residential     -     24’ x 12”

B.  Agricultural    -     40’ x 12”

C.  Commercial    -     40’ x 12”

3.     The following materials are approved for driveway pipe.

A.  Concrete

          B.  Corrugated Metal

C.     Hi-Q Black Plastic (Double walled) With A Minimum Of 12” Of Cover  

4.     Placing tile to fill in a roadside ditch.  Contact this office for details.

5.     Installation or replacement of mailboxes.  Contact this office for details.

6.     Contact this office prior to placing fence or fence posts or any type of concrete or brick columns.  They should not be in road right of way.

CONTACT THE ENGINEER’S OFFICE AT 937-456-4600 FOR INFORMATION ON GETTING A PERMIT APPLICATION.  AN ENGINEER’S REPRESENTATIVE WILL EVALUATE THE PERMIT APPLICATION AND GIVE YOU INSTRUCTIONS ON THE PROPER INSTALLATION.

 

J. STEPHEN SIMMONS P.E., P.S.

PREBLE COUNTY ENGINEER                                                 

 

Driveway Access Permit Application

Side Ditch Fill In Agreement

        

____________________________________________________________

Dear Preble County Residents:

Due to budgetary restraints, the "Adopt A Highway" that has been operating within the county will be abandoned. I would like to thank all of the organizations that have participated in the "Adopt A Highway" litter program over the years.  Although community response has dwindled over the last few years, the efforts to clean up each two mile stretch of highway that each group adopted was very much appreciated.  Each group provided a valuable community service by picking up the debris along our Preble County roads and helping to keep our county a pleasant place to drive.

Thank you, again, for your service to Preble County.


Sincerely,

bullet

Click Here to view our Department Projects Photo Album

Home   -   Departments   -   Current Events   -   Road Construction Updates  
 Road and Bridge Department Projects Photo Album   -   Links   -   Contact

J. Stephen Simmons P.E., P.S.
Preble County Engineer

Copyright ©1999-2000 Preble County Engineers Office
All rights reserved.